Knowledge Centre
Insight6 min read
Making mock-ups earn their cost
Visual, performance and system mock-ups each answer a different question. Here is how to brief them well.
By ALM Technical Team · 5 August 2025

The building envelope is where architectural ambition meets physics. Every decision made here ripples through energy performance, occupant comfort, fire safety and the long-term durability of the building.
Why an integrated approach matters
When responsibility for the envelope is fragmented across separate parties, the gaps between them become the weakest points of the system. An integrated team closes those gaps from early advice through to installation and handover.
“The most expensive facade is the one you have to fix twice.”
