Skip to content
Alder Castle facade
Completed

Alder Castle

Sub-contract appointmentCity of London2024

Project overview

Facade engineering validation and calculation support for a commercial refurbishment at Alder Castle, coordinating the facade package with performance and buildability requirements.

Support focused on engineering validation, calculations and coordinated facade-system review, with fire barriers and insulation strategy checked against the wider envelope build-up.

Key facts

SectorCommercial
RegionCity of London
EnvelopeFacade refurbishment
Fire / insulationSiderise + Rockwool
SupportValidation + calculations

Have an envelope challenge?

Bring us in early. The sooner we engage, the more risk and cost we can design out of your building envelope.

WhatsApp ALM